A spec-side and project-side reference for FSRU regas, FLNG topsides, LNG carrier冷却水, ballast and fire & wash systems — alloy selection, standard cross-reference, velocity envelope, and the joint-by-joint rules that decide whether the bundle leaks in year 3 or year 30.
A floating storage regasification unit, a floating LNG producer and an LNG carrier have one thing in common beyond the cargo: every one of them runs thousands of metres of small-to-medium bore pipe carrying seawater at 3-32 °C through coolers, ballast lines, fire & wash systems, and the regas / liquefaction heat exchangers. In a topsides module, a turret or a hull, those lines see velocity, sand, sulfides, occasional chlorination, vibration and constant thermal cycling. Pick the wrong alloy, and the line fails at the welded joint in 3-7 years. Pick the right one — almost always a 90/10 or 70/30 copper nickel alloy — and the same line is still in service in year 30. The choice is not about a material catalogue; it is about a small set of standards, a velocity envelope, and a galvanic-isolation discipline that has to be specified before the RFQ goes out.
EZ Steel Industrial has been producing copper nickel alloy pipe, copper nickel flanges, and companion pipe fittings and gasket stud bolt and nut kits from its Changsha base since 1994 — 500+ employees, 480,000+ t/y capacity across 8 product categories, with project book that includes petrochemical facilities, marine ship-building and power-plant / aerospace supply. This guide is the field-tested summary of how a 2026 buyer should specify, cross-check, and source a Cu-Ni piping package for a floating LNG asset.
Three things decide a seawater-pipe alloy: corrosion in chloride, resistance to sulfide attack, and tolerance of the velocity / sand / vibration regime. 90/10 (UNS C70600 / C70620) and 70/30 (UNS C71500 / C71520) are the two alloys that hit all three targets at a price the shipyard can live with. Pure copper is too soft for piping, aluminium brass fails in sulfide service, and titanium is over-specified for the bulk of the cooling / ballast network. The Cu-Ni family gets its corrosion resistance from a thin, self-healing surface oxide film that re-forms within hours if it is mechanically damaged — that is the engineering reason a 30-year-old Cu-Ni cooler bundle can be inspected and returned to service, while a 304 stainless cooler in the same seawater service has to be replaced.
90/10 (C70600) is 90 % copper, 10 % nickel, 1.0-1.8 % iron, 0.5-1.0 % manganese. The iron / manganese additions anchor the protective oxide film, raise the allowable velocity, and resist sulfides. 70/30 (C71500) doubles the nickel, has 0.4-1.0 % iron, and is selected for higher velocity, more aggressive water (e.g. polluted harbour, higher temperature) and longer design life. The trade-off is cost: 70/30 is roughly 1.4-1.8× the unit price of 90/10. In an FSRU regas skid or an LNG carrier冷却 system, the bulk of the piping is 90/10, with 70/30 reserved for the high-velocity sections, the most exposed hull penetrations, or the parts of the system where inspection is impossible once the module is in service.
The buyer-side mistake is to write "Cu-Ni" in the RFQ and expect a single standard to cover pipe, fittings, flanges and the joint. There is no single standard. The Cu-Ni package in an FSRU / FLNG / LNG carrier typically spans 4-6 standard documents, and the way they map to each component is the first thing to lock before the mill quotes.
| Component | ASTM | EN / EEMUA | JIS | GB |
|---|---|---|---|---|
| Seamless pipe (90/10, 70/30) | ASTM B466 / B466M | EEMUA 234 (seamless & welded), EN 12451 | JIS H3300 C7060 / C7100 / C7150 | GB/T 8890 |
| Welded pipe (90/10, 70/30) | ASTM B467 / B467M | EEMUA 234 | JIS H3300 | GB/T 8890 (seamless & welded) |
| Tube (condenser / cooler) | ASTM B111 / B111M | EN 12451 | JIS H3300 | GB/T 8890 |
| Fittings (butt-weld, socket-weld, threaded) | ASME B16.9 (BW) / B16.11 (SW) / B16.15 (threaded), with B466 / B467 material | EN 1254 (Cu-Ni fittings) | JIS B2311 / B2312 / B2313 (BW) | GB/T 11618 (Cu-Ni pressure fittings) |
| Flanges (Cu-Ni) | ASME B16.5 (with Cu-Ni material per B466), ASTM B151 / B151M (Cu-Ni bar / flange stock) | EEMUA 234 (flanges), EN 1092-1 (with Cu-Ni) | JIS B2220 (Cu-Ni) | GB/T 17241 (Cu-Ni) |
| Bolting (stud bolt + nut) | ASTM B151 / B467 (Cu-Ni bolting), ASME B16.5 (dimensional), B18.2.1 / B18.2.2 (threads) | EN 1515-2 (bolting selection) | JIS B1180 (bolting) | GB/T 5782 / GB/T 6170 (carbon-steel / SS bolting), Cu-Ni per project spec |
| Gasket | ASME B16.21 (spiral-wound, ring-joint, compressed fibre) | EN 1514 (gaskets for flange) | JIS B2404 | GB/T 4622 |
| Valves (ball, gate, globe, check) | API 6D (pipeline), ASME B16.34 (general), MSS-SP (socket / threaded), Cu-Ni body / trim per B466 | EN 593 (butterfly), EEMUA 182 (fire test) | JIS B2071 / B2002 / B2003 | GB/T 12234 / 12235 / 12236 |
EEMUA Publication 234 (latest 2018 edition) is the European offshore-industry standard for 90/10 and 70/30 Cu-Ni piping. It covers pipe, fittings, flanges, bolting, gaskets, weld procedures, velocity limits, water-quality limits, fabrication and inspection — and is the standard that class societies (DNV, Lloyd's, BV, ABS) usually reference in their offshore LNG rules. Writing "ASTM B466, EEMUA 234 compliant" in the RFQ is the cleanest way to make sure the mill is quoting against the right document set, not just the most familiar ASTM pipe specification.
Velocity decides whether a Cu-Ni line runs for 30 years or fails at the welded elbow in year 5. The EEMUA 234 limits are not "soft" engineering guidance — they are the basis for class society approval, and the inspector will check them. The two limits that matter most:
| Alloy | Sustained (design) velocity | Peak / intermittent velocity | Reason for the limit |
|---|---|---|---|
| 90/10 (C70600 / C70620) | ≤ 3.5 m/s (≈ 11.5 ft/s) | ≤ 4.0 m/s for short transients | Above this, the protective oxide film is eroded faster than it can re-form, and the line undergoes flow-accelerated corrosion (FAC) at the elbow / tee. |
| 70/30 (C71500 / C71520) | ≤ 4.5 m/s (≈ 14.8 ft/s) | ≤ 5.0 m/s for short transients | Higher nickel content anchors the oxide film; tolerates higher velocity and slightly higher temperature. |
The visual representation of the operating envelope, as a buyer should keep it on the datasheet, is:
Three common over-specs: (1) the seawater inlet pipe is sized for pump NPSH-r margin without checking the velocity, ending up at 4.5 m/s in 90/10 — the line erodes at the first bend in 5-7 years. (2) The fire & wash system runs at a much higher peak flow for short periods (deluge, fire pump test) — the line has to be checked at peak, not nominal, and 90/10 may need to step up to 70/30 in the run upstream of the deluge valve. (3) Sand / silt in harbour or shallow water lowers the velocity limit further; if the intake is in a high-sediment zone, drop the design velocity 0.5 m/s below the EEMUA table and inspect the first 50 m of pipe every dry-dock.
The Cu-Ni scope is similar across the three asset types, but the proportion of pipe, fittings, flanges and valves shifts with the operating profile. The table below is what the engineering and procurement teams should be looking at together before the RFQ goes out.
| System | FSRU (regas) | FLNG (liquefaction) | LNG carrier (transport) |
|---|---|---|---|
| Seawater cooling (regas / condenser / lube oil cooler) | Heavy (continuous, warm inlet) | Heavy (continuous, warm inlet) | Moderate (intermittent on-route) |
| Ballast | Moderate (storage mode) | Moderate (storage mode) | Heavy (load / discharge cycle) |
| Fire & wash (deluge, spray) | Heavy (regas-skid protection) | Heavy (process-area protection) | Moderate (deck / cargo deck) |
| Stripper / gas-side (Glycol, amine, CO₂) | Not applicable | Heavy (Cu-Ni + stainless + alloy) | Not applicable |
| Typical Cu-Ni share of small-bore pipe | 60-75 % | 40-55 % (balance in stainless, alloy) | 50-65 % |
| Alloy preference | 90/10 main, 70/30 inlet & chlorination sections | 90/10 main, 70/30 high-velocity / process | 90/10 main, 70/30 in sea chests & high-erosion zones |
The engineering insight that ties the three together: in every case, the sea-chest, the overboard discharge and the chlorination dosing point are the highest-velocity / highest-erosion parts of the system, and the alloy there is the design driver. If you cannot inspect a pipe once the module is in service, that pipe should be 70/30 rather than 90/10 — even at the 1.4-1.8× unit-cost premium.
The failure mode in a Cu-Ni seawater system is almost never the pipe itself. It is the joint: a galvanic cell between the Cu-Ni flange and a carbon-steel bolt, a gasket that has absorbed chloride and swollen, or a weld that was made without a backing-gas purge and now has porosity on the seawater side. The bolted-joint stack is therefore the section of the package that deserves the most specification time, not the pipe wall.
When Cu-Ni flanges are bolted to a steel pipe (or a steel flange), the galvanic series puts the steel at risk. The standard fix is to use Cu-Ni stud bolts and nuts (per ASTM B151, matched to the flange UNS number), or — for budget-critical sections — to use carbon-steel bolting with a CSA-class gasketing kit (a phenolic gasket with an EPDM insert that breaks the galvanic path). EZ Steel ships copper nickel flanges with matching Cu-Ni stud-bolt kits in the same heat to avoid this risk by default. The buyer can also specify a 1.5-3 mm thick "isolation gasket" (phenolic + EPDM) as a third option for budget-driven packages.
Compressed non-asbestos fibre (CNAF) gaskets with nitrile or EPDM binder are the default for Cu-Ni class 150 / PN 10 service. Spiral-wound gaskets with graphite or PTFE filler and a 304 / 316 inner ring are used for Class 300 / PN 25 and above. PTFE gaskets are chemically clean and resist chlorination, but they creep under sustained load and need re-torqueing on the first hot cycle. EZ Steel ships matching gasket stud bolt and nut kits for every Cu-Ni flange shipment, with the gasket and bolting material traceable to the same QA plan.
Cu-Ni welds need backing-gas (typically 99.99 % argon at 15-25 cfh) on the inside of the pipe to prevent internal oxidation. The filler metal is AWS A5.6 / A5.7M ECuNi (for 90/10) or the matching 70/30 filler (for C71500). The weld procedure should be qualified per ASME IX or EN ISO 15614, and the inspector should require dye-penetrant or radiographic NDT on every joint — not just on a sampling basis. A weld that looks clean from the outside but has internal oxide will start pitting within the first 18 months of seawater service.
The reason the project-bundle model matters more for Cu-Ni than for carbon steel is the documentation chain. Each component — pipe, fitting, flange, stud bolt, gasket — has to be traceable to the same heat (or to a heat with the same chemistry / mechanical envelope). A stockist-sourced package typically has 3-4 different heat numbers, 3-4 different MTC chains, and a class surveyor who will raise a non-conformity if the chemistries do not match. A mill-direct package has one heat, one MTC chain, one QA team, and one set of EN 10204 3.1 (or 3.2 for class-witnessed) certificates. EZ Steel's 8-category, 480,000+ t/y Changsha operation is built around this model — copper nickel alloy pipe, pipe fittings, copper nickel flanges, pipe flanges in carbon / stainless / alloy, gasket stud bolt and nut, and industrial valves — all from the same production system with one project manager and one MTC chain.
Default to 90/10 for the bulk of the seawater, ballast, and fire & wash network. Step up to 70/30 in four specific places: the sea-chest and the run between the sea-chest and the first isolation valve, the run immediately downstream of any chlorination dosing point, the regas-module / process-area cooling section where design temperature exceeds 40 °C, and any section of pipe that cannot be inspected once the module is in service. The 1.4-1.8× unit-cost premium on 70/30 is recovered several times over in inspection and replacement avoidance over a 25-30 year design life.
Welded (B467) is the right default for NPS 2-12 (DN 50-DN 300) and most fire & wash / ballast / cooling systems. The internal weld bead has to be specified as IFI (as-welded), IFR (removed), or IFD (displaced) per the standard; for seawater service, IFR or IFD is the safer default because it eliminates the crevice that would otherwise become a corrosion-initiation site. Seamless (B466) is required for the high-pressure regas / process-side sections, for tube bundles, and for U-bend cooler headers where the bending process cannot accept a weld seam. The cost premium on seamless over welded is roughly 20-40 %; spend it where the standard or the engineering case requires it, not everywhere.
Yes, with a deliberate galvanic-isolation strategy. The Cu-Ni flange and the carbon-steel bolt create a galvanic couple in seawater; without an isolator, the steel bolt corrodes preferentially and the joint leaks. The standard solutions are: (a) Cu-Ni stud bolts and nuts (per ASTM B151, matched to the flange UNS), (b) carbon-steel bolting with a phenolic + EPDM isolation gasket and an insulating sleeve / washer kit, or (c) stainless-steel bolting (typically B8M / B8 class) with the same isolation kit. Cu-Ni bolting is the cleanest engineering answer; isolation gaskets are the lower-cost compromise. Do not mix without one of these three strategies in place.
For an EEMUA 234-compliant package, the mill should issue: (i) a type-3.1 MTC (EN 10204) per heat, with full chemistry, mechanical properties, and heat-treatment condition; (ii) a weld-procedure qualification record (WPQR / WPS) for the Cu-Ni butt-weld and socket-weld procedures, including the backing-gas and ECuNi filler data; (iii) NDT reports — 100 % radiographic or ultrasonic on every joint, plus hydrostatic at 1.5× design pressure (or eddy-current per B467); (iv) a PMI verification on every flange and fitting; (v) for class-witnessed sections, a 3.2 MTC with the independent inspector's stamp (DNV, Lloyd's, BV, ABS, RINA). A mill that can deliver all five without subcontracting the inspection is a mill with a class-society-capable QA system.
For a typical 50-200 t package covering 90/10 pipe + fittings + flanges + bolting + gaskets, the mill-direct lead time from PO to first dispatch is 10-16 weeks, depending on the proportion of seamless vs welded, the size mix, and the class-society scope. Welded-only packages lean toward 8-12 weeks; packages with a high seamless content, large U-bend cooler headers, or class-society-witnessed NDT run 14-18 weeks. Adding the third-party inspection window to a 3.2 package adds 5-7 days at the front of the schedule. EZ Steel's Changsha mill (500+ employees, 480,000+ t/y capacity) typically delivers FSRU / FLNG Cu-Ni packages in the 10-14 week window for the typical mix.
For an FSRU regas, FLNG topside, or LNG carrier copper nickel alloy piping package, send your datasheet (alloy, standard, size range, schedule, joint discipline, class-society scope) to export@ezsteelpipe.com or call +86 731 8870 6116. A project engineer (not a salesperson) will respond within one business day with an alloy / standard matrix, a velocity-envelope check, a joint-by-joint bolting / gasket recommendation, and a mill-direct lead time with the MTC 3.1 / 3.2 plan. EZ Steel Industrial — Changsha, China — since 1994.
Browse the full copper nickel alloy family, the copper nickel flanges and steel flanges sub-families, and the bundled pipe fittings, pipe flanges, gasket stud bolt and nut, and industrial valves scope.