export@ezsteelpipe.com
+86 731 8870 6116
| Maintenance Interval | Key Tasks | Purpose |
|---|---|---|
| Weekly | Visual inspections (leaks, discoloration, corrosion); pressure and temperature monitoring; check for unusual noises/vibrations | Catch early signs of issues like leaks or blockages before they escalate |
| Monthly | Thickness testing (using ultrasonic tools); gasket and fitting checks; fluid sampling for pH/chemical balance | Assess pipe wall integrity and ensure connections (gaskets, flanges) are secure |
| Quarterly | Internal cleaning (mechanical or chemical descaling); insulation inspection (for heat loss); valve operation tests | Prevent scale buildup (which reduces heat efficiency) and ensure insulation is intact |
| Annual | Comprehensive corrosion analysis; weld and joint integrity checks; compliance review with EEMUA 144 standards | Deep-dive into long-term wear and ensure alignment with industry safety guidelines |
| 5-Yearly | Full system pressure testing; replacement of aging components (e.g., gaskets, valves); material fatigue assessment | Proactively address wear that accumulates over time to avoid catastrophic failure |
Related Products