How to read a flange drawing, match the right gasket, and avoid the most common leakage problems on oil & gas, petrochemical, power and marine projects — straight from a 480,000-ton mill-direct manufacturer.
More than half of the unscheduled shutdowns we are called into as a piping supplier trace back to one of three things: the wrong flange facing was specified, the wrong gasket was paired with it, or the bolting was not torqued to the right sequence and load. None of those are material failures. They are specification failures — and they are completely avoidable when the engineer writing the MTO and the buyer placing the order both understand the basics of the bolted joint.
This guide is built on what our team at EZ STEEL INDUSTRIAL sees on the RFQs that come through our export desk every week. We will walk through every common flange facing defined in ASME B16.5, show which pipe flanges they are typically cut on, which pipe fittings sit next to them, and which gasket stud bolt nut combination actually holds pressure in the field. Along the way we will flag the mill test, NDT and traceability expectations that should be on every quote.
A piping system is only as strong as its weakest joint. A seamless API 5L X65 line pipe rated for 600 bar will leak at 20 bar if the flange face is mismatched, the gasket is wrong, or the stud bolts are under-torqued. Three things have to be correct at the same time: the flange geometry, the sealing surface, and the fastener assembly. Treating any one of them as an afterthought is how spec gaps turn into field rework.
The good news is that the variables are finite. ASME B16.5 (Pipe Flanges and Flanged Fittings) and ASME B16.47 (Large Diameter Steel Flanges) define the geometry. ASME B16.20 (Metallic Gaskets for Pipe Flanges) covers the ring-and-spiral-wound side. B16.21 covers non-metallic. Once you know which one you are on, the gasket, the bolt class and the torque sequence all but pick themselves.
Flange facing type ↔ Gasket style ↔ Bolt grade and torque procedure. If any one of the three is changed without re-checking the other two, the joint will either over-stress the gasket or under-load it.
B16.5 actually defines seven geometries, but the last one (O-ring) shows up mostly on API 6A wellhead equipment, so on a process plant MTO you will see the following six on a regular basis:
A 1.6 mm (Class 150/300) or 6.4 mm (Class 400 and above) raised ring is machined around the bore. The gasket sits inside this ring, so the seating stress is concentrated on a smaller area and you can use softer gaskets at higher pressures. RF is the stock finish for almost every carbon steel and stainless steel flange we ship out of Changsha, and it is what you should default to unless the service or the standard tells you otherwise.
The face is machined completely flat. The full gasket surface bears the load, which is why FF is paired with cast iron, fiberglass, PVC and other brittle flanges that would crack if the load were concentrated on a small raised ring. FF flanges are almost never used above Class 300 and are not common in our steel flanges line.
A precision groove is cut into the flange face and a solid metal ring (oval or octagonal) is compressed into it. The seal is metal-to-metal, which is why RTJ is mandatory from Class 600 upwards in hydrocarbon service and from Class 900 in any service. We supply RTJ on weld neck and blind flanges in ASTM A105, A350 LF2, A182 F11/F22/F316L and F51. If your service involves H₂S, sour service, or anything above 250 °C, RTJ is almost always the right call.
One flange has a raised tongue, the other a matching groove. The gasket is fully trapped, so it cannot blow out and is self-aligning. T&G is common in heat exchanger channels, chemical dosing skids and instrumentation. The trade-off is that the piping has to be precisely aligned before the bolts go in, so it is less forgiving on a long, hot run.
Same principle as T&G but the gasket surface is larger, which spreads the seating stress and lets you run at higher pressures with a soft gasket. M&F shows up in fuel oil, lube oil and similar services where you want the gasket retained but the joint to be more forgiving than T&G.
An O-ring sits in a shallow groove. Used in hydraulic and pneumatic systems, and in some sanitary and cryogenic applications. Not a routine B16.5 spec, so we only cut it on RF flanges when an RFQ specifically asks for an O-ring face.
The table below summarizes the choices an engineer usually has to make on the spot. Class column refers to ASME B16.5 pressure class.
| Facing | Typical Class | Pair with Pipe Fittings | Recommended Gasket | Watch Out For |
|---|---|---|---|---|
| RF (Raised Face) | 150 – 2500 | WN, SO, SW, Threaded, Blind, Lap Joint | Spiral-wound (with inner/outer ring), Compressed non-asbestos, Graphite | Gasket must sit inside the RF; do not exceed 1.6 / 6.4 mm raised height |
| FF (Flat Face) | 150 – 300 | WN, SO with full face gasket | Full-face compressed non-asbestos, PTFE, rubber | Only for brittle (CI, GRP) flanges; not for carbon / alloy steel above CL300 |
| RTJ (Ring-Type Joint) | 600 – 2500 | WN, Blind (and integral with weldolet) | Soft iron, low-carbon steel, 304/316, Monel ring (Style R / RX / BX) | Ring hardness must be ~30 HB softer than the groove; replace ring every time |
| T&G (Tongue & Groove) | 150 – 600 | WN, SW, integral with fittings | Ring or sheet gasket sized to tongue | Strict alignment required; cannot mix tongue and groove with RF |
| M&F (Male & Female) | 150 – 600 | WN, SW | Ring gasket sized to male face | Same as T&G; easier on alignment but more expensive to refurbish |
| O-Ring | 150 – 600 | Specialty WN, instrumentation | Elastomer (NBR, FKM, FFKM) or metal O-ring | Limited to clean service; check chemical compatibility early |
On a typical 30 m length of process piping you will see roughly 70% Weld Neck (WN) flanges, 20% Slip-On (SO) and Socket Weld (SW), and 10% specialty types (threaded, lap joint, blind). The split shifts when the facing shifts:
If the procurement team orders the fittings before the gasket spec is locked in, the gaskets, the bolt length and sometimes the flange facing itself often have to be re-quoted. Lock the bolted-joint spec first, then the line pipe, then the fittings — and the cost line will drop by 3 to 8% on a typical MTO.
Facing type is half the story. The other half is the forging material. EZ STEEL INDUSTRIAL holds forging stock in three families, and we recommend matching the family to the service before matching the facing to the joint.
Default for general hydrocarbon service, water, steam and air. A105 is the workhorse for CL150 to CL600. A350 LF2 is required for low-temperature service below -46 °C (most LNG, ammonia and CO₂ systems). A516-70 is used for heavier rolled plate flanges in B16.47 Series A.
F304/F304L for general corrosive service, F316/F316L for chloride-bearing media (seawater, offshore, chemical), F321 and F347 for stabilized service around 600 °C, F51 (duplex) and F53 (super duplex) for high-chloride and sour service. We cut all of these on RF, FF, RTJ and T&G faces, and we deliver them with EN 10204 3.1 mill certificates plus optional PMI verification on request.
F11 (1.25Cr-0.5Mo) and F22 (2.25Cr-1Mo) for high-temperature hydrogen and hydrocracker service. F91 (9Cr-1Mo-V-Nb) for superheater and reheater headers in USC power plants. Inconel 600/625 and Monel 400 for nuclear, acid and seawater service. These are almost always paired with RTJ faces above CL600.
If the service is NACE MR0175 / ISO 15156 sour, every pressure-containing component — flange, stud bolt and gasket ring — has to be sour-rated. We provide full traceability and can dual-certify to NACE and ASTM on the same heat.
On a mill-direct PO, the paperwork is as important as the part. The four documents that catch 90% of inspection gaps are:
If your RFQ does not list these four, ask for them. A 2% documentation gap on a 10,000-piece PO is the difference between an inspection hold and a clean release.
A clear spec line looks like this: "WN, RF, CL150, NPS 6, SCH 40, ASTM A105, B16.5-2020, 3.1 MTC, sour-service per NACE MR0175, RTJ not required." Once that line is locked, the matching socket weld fittings, threaded fittings and stud bolt grade can be selected in a few minutes. Five fields you should never leave blank on a flange MTO: flange type, facing, class, material and standard edition (B16.5-2020 vs. 2017 vs. 2013 change dimensions and pressure-temperature ratings, so the edition is part of the spec).
EZ STEEL INDUSTRIAL has been a mill-direct producer of industrial piping materials since 1994 from our headquarters in Changsha, Hunan. We operate an API / EN / ASME certified pipe mill with an annual capacity above 480,000 tons, more than 500 production staff, and an in-house ISO 9001-certified lab. The same engineering and QC team that produces our seamless carbon steel pipe, stainless steel pipe and copper-nickel lines also produces the matching steel flanges, butt weld, socket weld and threaded fittings, and the gasket / stud bolt / nut set that goes with them.
Our pipe has been used on the South-to-North Water Diversion Project, the West-East Gas Pipeline, large petrochemical and LNG plants, marine vessel piping systems, and on tubular piling for foundation construction. The same project track record is what you are buying when you source the joint components from us: one heat of steel, one test report, one set of documentation, and one technical contact for the whole bolted joint.
Send us the line item with the five fields in Section 8 — flange type, facing, class, material and standard edition — and our export desk in Changsha will turn around a mill-direct quote within one business day. We handle 50-piece engineering orders, 5,000-piece skid packages and 100,000-piece MTOs from the same production line.