export@ezsteelpipe.com
+86 731 8870 6116
| Maintenance Task | Frequency | Key Actions | Tools/Equipment |
|---|---|---|---|
| Visual Inspection (External) | Weekly | Check for corrosion, leaks, dents, loose supports. | Flashlight, camera, inspection checklist. |
| Visual Inspection (Connections/Fittings) | Monthly | Inspect flanges, valves, gaskets for leaks or damage. | Torque wrench, gasket thickness gauge. |
| Non-Destructive Testing (UT/MPT) | Quarterly | Measure wall thickness, check for cracks. | Ultrasonic tester, magnetic particle kit. |
| Pigging/Cleaning | 3-6 Months | Remove scale, debris, or sludge. | Pigs, pig launcher/receiver, high-pressure jetter. |
| Coating Inspection/Touch-Up | Annually | Check for chips, peeling; repair with matching coating. | Coating thickness gauge, paintbrush, epoxy. |
| Hydrostatic Pressure Test | 3-5 Years | Pressurize to 1.5x operating pressure; check for leaks. | Pressure gauge, pump, water source. |
| Cathodic Protection Check | 6 Months | Measure voltage/current; replace anodes if needed. | Multimeter, reference electrode. |
| Valve Maintenance | Monthly (operation); Annually (overhaul) | Operate valves, lubricate stems, replace seals. | Lubricant, valve wrench, replacement seals. |
Related Products