export@ezsteelpipe.com
+86 731 8870 6116
| Mistake | Common Causes | Key Consequences | Prevention Tips |
|---|---|---|---|
| Material incompatibility | Budget cuts, miscommunication, ignored environmental factors | Corrosion, leaks, system failure | Align materials with specs (e.g., BS2871 copper alloy for marine use); verify CoCs |
| Improper handling | Rushed workflows, lack of training, poor storage | Micro-damage, reduced efficiency, leaks | Use padded racks, soft lifting slings; inspect tubes pre-installation |
| Incorrect tube expansion | Uncalibrated tools, untrained operators | Leaks, cross-contamination, pressure bursts | Use calibrated tools; conduct pull tests and borescope inspections |
| Ignoring thermal gaps | Misunderstanding of thermal dynamics, "tight fit" focus | Fatigue cracks, tube sheet distortion | Calculate expansion coefficients; mark gaps on tube sheets |
| Skipping post-installation testing | Deadlines, overconfidence in components | Undetected leaks, regulatory non-compliance | Conduct pressure tests, leak detection, thermal imaging |
Related Products